198k views
3 votes
A construction crew needs to build a road that will be 20 miles long. The crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long. How much more road does the construction crew need to build? 2.18 miles 4.94 miles 11.38 miles 13.56 miles

2 Answers

5 votes

Answer:

4.94 miles

Explanation:

User Valentasm
by
4.4k points
0 votes

Answer:

Your answer would be (B) 4.94. Hope this helped!

6.44 + 8.62 = 15.06

20 - 15.06 = 4.94

Explanation:

Hope this helps : )

User Adamzwakk
by
3.6k points