134k views
2 votes
Thomsen Computer Company produces three products: Earth, Wind, and Fire. Earth requires 80 machine setups, Wind requires 60 setups, and Fire requires 180 setups. Thomsen has identified an activity cost pool with allocated overhead of $360000 for which the cost driver is machine setups. How much overhead is assigned to each product?

User Kdani
by
4.5k points

1 Answer

3 votes

Answer:

Earth = $90,000

Wind = $67,500

Fire = $202,500

Step-by-step explanation:

Activity based costing is a costing system that assigns the cost of identified activities , mostly overhead and indirect cost to all products and services produced according to the respective volume of the activities consumed by each of the products and services , using cost drivers.

Workings.

The cost driver in the scenario is Machine set up

Earth = 80 set up

Wind = 60 set up

Fire = 180 set up

Total = 320 set up

General Overhead = 360,000

Earth = 80/320 *360,000 = 90,000

Wind = 60/320*360,000 = 67,500

Fire = 180/320*260000 = 202,500

User Scmg
by
4.4k points