Answer:
2.36 km
Explanation:
First they covered 3/8 of the road, so in figures that is;
=
=3.75 km
The second week they covered 7/18 of the road which is;
=
= 3.89 km
If we combine the two distances, we get;
= 3.75 km + 3.89 km
= 7.64 km
Subtract this from the total distance and you get
= 10 km - 7.64 km
= 2.36 km
Which means 2.36 km of the road is left to be covered with asphalt.