65.2k views
1 vote
Time, budget, and safety are almost always considered to be

1. Efficiency
2. Constraints
3. Trade-offs
4. Criteria

User DWR
by
4.0k points

2 Answers

4 votes
the answer is constraints
User Vibhu Dadhichi
by
5.3k points
5 votes

Answer:

The answer is option # 2. (Constraints).

User Wes Haggard
by
4.8k points