Time, budget, and safety are almost always considered to be

1. Efficiency
2. Constraints
3. Trade-offs
4. Criteria

User DWR
by
4.2k points

2 Answers

4 votes
the answer is constraints
User Vibhu Dadhichi
by
5.7k points
5 votes

Answer:

The answer is option # 2. (Constraints).