Answer:
75% is the work center utilization
Step-by-step explanation:
Mathematically;
Utilization = (Actual Output/Design capacity)*100
From the question;
Actual output = 300
Design capacity = 400
Substituting these values in the equation, we have:
= (300/400)*100
= 0.75*100
= 75%