Answer:
a. 5 batches
c. 3.33
d. 83%
e. 15 hours
Explanation:
As per the data given in the question,
a)
Capacity of baking process = 60 ÷ Activity time for per batch
= 60÷12
= 5 batches per hour
b)
Bottleneck of manufacturing process = Cooling price(Since it has maximum activity time)
c)
Process Flow rate = Total number of batches per hour for system, which is described at capacity of bottleneck
Therefore, Flow rate = number of batches at bottleneck
= 60 ÷ 18
= 3.33
d)
Utilization of mixing process = Activity time ÷ Bottleneck activity time
= 15 ÷ 18
= 83 %
e)
Time required for 50 batches = Time for bottleneck for processing 50 batches
= 18 × 50
= 900 minutes
= 15 hours