193k views
3 votes
Which of the following activities will allow an engineer to determine that a building's design is sound?

O determining a feasible floor plan
assembling an expert team
O conducting structural calculations
O following OSHA safety rules

User Pdubois
by
3.6k points

2 Answers

6 votes
Answer: Determining a feasible floor plan.
Explanation: since the process of a floor plan is the core.
User CalvinDale
by
4.4k points
6 votes

Answer:

determining a feasible floor plan assembling an expert team

Step-by-step explanation:

Because you can hear through the floor

User Toxotes
by
4.4k points