96.5k views
5 votes
Neeeeeeeed heeeeeeeeelpppp​

Neeeeeeeed heeeeeeeeelpppp​-example-1
User Dax Durax
by
8.3k points

1 Answer

2 votes

Answer:

A) The cost is the same at 5 months.

Explanation:

Lets use m to represent the number of months it will take for the cost to be the same. If we set up an equation, we can write:

75 + 10m = 50 + 15m

-50 on both sides

25 + 10m = 15m

-10m on both sides

25 = 5m

Divide by 5 on both sides.

5 = m

That means it will take 5 months for the costs to be the same.

User David Chopin
by
7.8k points

Related questions

asked Jun 4, 2019 156k views
Rretzbach asked Jun 4, 2019
by Rretzbach
8.1k points
1 answer
5 votes
156k views
asked Apr 26, 2020 148k views
Biesi asked Apr 26, 2020
by Biesi
8.7k points
1 answer
5 votes
148k views