96.5k views
5 votes
Neeeeeeeed heeeeeeeeelpppp​

Neeeeeeeed heeeeeeeeelpppp​-example-1
User Dax Durax
by
4.6k points

1 Answer

2 votes

Answer:

A) The cost is the same at 5 months.

Explanation:

Lets use m to represent the number of months it will take for the cost to be the same. If we set up an equation, we can write:

75 + 10m = 50 + 15m

-50 on both sides

25 + 10m = 15m

-10m on both sides

25 = 5m

Divide by 5 on both sides.

5 = m

That means it will take 5 months for the costs to be the same.

User David Chopin
by
4.1k points