Answer:
$9.2 0
Step-by-step explanation:
The calculation of the Finishing Department is shown below:-
Plant - wide overhead rate = Total overhead ÷ Total machine hour
= ($470,000 + $737,900) ÷ ($470,000 + 133,950)
Plant wide overhead rate = $2 per machine hour
Machine hour for product = 4.2 + 0.4
= $4.6 machine hour
Applied overhead = Machine hour for product × Plant wide overhead rate
= $4.6 × $2
= $9.2 0