Assume that the Assembly Department allocates overhead based on machine hours, and the Finishing Department allocates overhead based on direct labor hours. How much total overhead will be assigned to a product that requires 1 direct labor hour and 4.2 machine hours in the Assembly Department, and 5.0 direct labor hours and 0.4 machine hours in the Finishing Department?

1 Answer

4 votes

Answer:

$9.2 0

Step-by-step explanation:

The calculation of the Finishing Department is shown below:-

Plant - wide overhead rate = Total overhead ÷ Total machine hour

= ($470,000 + $737,900) ÷ ($470,000 + 133,950)

Plant wide overhead rate = $2 per machine hour

Machine hour for product = 4.2 + 0.4

= $4.6 machine hour

Applied overhead = Machine hour for product × Plant wide overhead rate

= $4.6 × $2

= $9.2 0