Assume that the Assembly Department allocates overhead using a plantwide overhead rate based on machine hours. How much total overhead will be assigned to a product that requires 1 direct labor hour and 2.5 machine hours in the Assembly Department, and 3.5 direct labor hours and 0.5 machine hours in the Finishing Department?

User BSUK
by
3.4k points

1 Answer

1 vote

Answer:

Instructions are listed below.

Step-by-step explanation:

Giving the following information:

Assume that the Assembly Department allocates overhead using a plantwide overhead rate based on machine hours.

The first thing that we need is the predetermined overhead rate. We weren't provided with this information, but I will give the formula and a small example to guide an answer:

To calculate the estimated manufacturing overhead rate we need to use the following formula:

Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

For example:

Estimated overhead= $200,000

Estimated machine hours= 35,000

Estimated manufacturing overhead rate= 200,000/35,000= $5.71 per machine hour

Now, we can allocate overhead:

Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base

Because it is a plantwide overhead rate, we need to sum the total machine hours required:

Machine hours= 2.5 + 0.5= 3 machine hours

Allocated MOH= 5.71*3= $17.13 per unit