Answer:
16 hours
Explanation:
Total length of the road that needs to be repaved =
miles
Total length of the road which is repaved by the road crew per hour =
miles
Total number of hours required to repave the whole road = (Length of the road to be repaved)/(Length of the road repaved by the crew per hour)
=
![\[(4)/(5) / (1)/(20)\]](https://img.qammunity.org/2021/formulas/mathematics/middle-school/3lv3uxkh8lflqczmawxkbrdpdp64rb2edc.png)
=
![\[(4)/(5) * 20\]](https://img.qammunity.org/2021/formulas/mathematics/middle-school/liekldaeam4fgp0xg9c8r9co2cfhg7ce12.png)
= 16 hours