A road crew must repave a road that is 4/5 miles long. They can repave 1/20 miles each hour. How long will it take the crew to repave the road

User Etzeitet
by
3.7k points

2 Answers

6 votes

Answer and Step-by-step explanation:


Good~Day!


Let's~solve`your~equation!

We know that:


(4)/(5)~mi~and~(1)/(20)~mi~per~hour.


So,~multiply~(4)/(5)~by~a~number~that~will~give~your~denominator~(5)~to~20


5 ×
4~is~20,~multiply~(4)/(5)~by~4.


(16)/(20)~miles,~or~16~hours,~since~(1)/(20)~mi~is~made~per~hour.


So~16~hours~is~your~answer!

User Agirardello
by
4.1k points
2 votes

Answer:

16 hours

Explanation:

Total length of the road that needs to be repaved =
\[(4)/(5)\] miles

Total length of the road which is repaved by the road crew per hour =
\[(1)/(20)\] miles

Total number of hours required to repave the whole road = (Length of the road to be repaved)/(Length of the road repaved by the crew per hour)

=
\[(4)/(5) / (1)/(20)\]

=
\[(4)/(5) * 20\]

= 16 hours