Answer:
16 hours
Explanation:
Total length of the road that needs to be repaved =
miles
Total length of the road which is repaved by the road crew per hour =
miles
Total number of hours required to repave the whole road = (Length of the road to be repaved)/(Length of the road repaved by the crew per hour)
=
=
= 16 hours