a) Capacity of the washing stage = 10*60/30 = 20 orders/hour
b) Capacity of the drying stage = 15*60/40 = 22.50
c) Washer is bottleneck because capacity of washing stage is lower
d) Capacity of Money laundry = (10+15)*60/(30+40) = 25*60/70 = 21.43 orders/hour
e) Bacause washer is bottleneck, they should buy washer
f) Utilization of washers on average = 8/20=40%
g) Utilization of dryers on average = 8/22.5 = 35.56%
h) On average there are 5 orders in washing stage
5/8 =0.625
j) On average there are 7 orders in drying stage
7/8 = 0.875