75.4k views
4 votes
If a lineman can install 12 insulators in 183/4 hours, how many insulators should he be able to install in 281/8 hours?

2 Answers

4 votes

Answer:

$0.04 per foot

Explanation:

User Semyon Burov
by
4.9k points
5 votes

Answer: 9

Explanation:

12 insulators = 183/4 hours

x = 281/8

x × 183/4 = 12 ×281/ 8

183x/4 = 6 × 281/4

183x / 4 = 1686 / 4

4 cancel out 4

183x = 1686

Divide bothside by 183

x = 1686/183

x= 9.21311

x = 9 approximately.

User Dpjanes
by
5.4k points