A building contractor is to dig a foundation 45 feet long, 16 feet wide, and 6 feet deep. The contractor pays $11 per load for trucks to remove the dirt. Each truckload holds 4 cubic yards. What is the cost to the contractor to have all the dirt hauled away?

User Csharpbd
by
8.6k points

1 Answer

3 votes

Answer:

I'm not sure if you have to round it up but I think it's $15681.6