Answer:
Amount cubic metres of gravel need = 1.5 cubic meter
Explanation:
Given:
Parts
cement = 1 part
sand = 2 parts
gravel = 3 parts
Find:
Amount cubic metres of gravel need
Computation:
Amount cubic metres of gravel need = 3[Part of gravel / Total of all parts]
Amount cubic metres of gravel need = 3[3 / (1+2+3)]
Amount cubic metres of gravel need = 3[3 / 6]
Amount cubic metres of gravel need = 3[0.5]
Amount cubic metres of gravel need = 1.5 cubic meter