Answer:
1779 veh/h
Step-by-step explanation:
Given :
Peak hour factor, PHF = 0.84
Heavy vehicle adjustment factor,
= 0.847
Analysis flow rate,
= 1250 pc/h/ln
We know that,
Analysis flow rate,
Here, v = peak hour volume
= grade adjustment factor which is 0.99 for rolling terrain.
> 1200 pc/h/ln
v = 1779 veh/h
Therefore, the peak hour volume, v = 1779 veh/h