Answer:
Cost 64951.91
Explanation:
We are to assume that the new road and Lincoln Lane meat at right angles. If that is true we can use the Pythagorean Theorem.
Givens
a = 1.5 miles
b = ?
c = 3 miles
Cost per mile = 25000
Solution
a^2 + b^2 = c^2
1.5^2 + b^2 = 3^2
2.25 + b^2 = 9
b^2 = 9 - 2.25
b^2 = 6.75
sqrt(b^2) = sqrt(6.75)
b = 2.5981
Cost
1 mile costs 25000
2.5981 costs x
1/2.5981 = 25000 / x Cross Multiply
x = 2.5981 * 25000
x = 64951.91