A construction company takes 1 3/8 hours to remove 2 1/2metric tons of dirt from a construction site.What is thr unit rate in metric tons per hour?Write your answer as a fraction or mixed number in simplest form.

User Xarantolus
by
4.3k points

1 Answer

4 votes

The company takes 1 3/8 hrs to remove 2 1/2 metric tonnes of dirt

in 1 hour they will remove x metric tonnes of dirt


(1(3)/(8))/(1)\text{ = }(2(1)/(2))/(x)\text{ that is by way of ratio}
((11)/(8))/(1)=((5)/(2))/(x)
(11)/(8)x\text{ =}(5)/(2)\text{ That is by cross multiplying}
\begin{gathered} 11x\text{ }*2=5*8 \\ 22x\text{ = 40} \\ x=\text{ }(40)/(22) \\ x=(20)/(11) \\ or\text{ x=1}(9)/(11)\text{metric tonnes of dirt per hour} \end{gathered}