392,320 views
4 votes
4 votes
For a system level product support arrangement (PSA) with a Product Support Integrator (PSI) that includes metrcis of Material Avilability (AM) and Material Reliability (RM) ideally the PSI must maintain control over all applicable aspects of product support affecting system

a. True
b. False

User Igloczek
by
2.8k points

2 Answers

24 votes
24 votes
The answer is true !!
User Ayush Mishra
by
2.8k points
21 votes
21 votes
I think the answer is: True.
User Nishant Kumar
by
3.2k points