If, upon final piping inspection, the installation is found to be in accordance with the provisions of this code, what is the next step?

1) Proceed with the project
2) Request modifications to the installation
3) Halt the project until further inspection
4) Ignore the findings and continue with the project

User Felix Guo
by
8.0k points

1 Answer

4 votes

Final answer:

The next step is to proceed with the project if the installation is found to be in accordance with the code provisions.

Step-by-step explanation:

The next step, upon final piping inspection, would be to proceed with the project. If the installation is found to be in accordance with the provisions of the applicable code, it means that the installation meets the required standards and is considered acceptable.