Final answer:
Option B). The Waterfall method usually results in a significant time delay between requirements analysis and deployment of the system.
Step-by-step explanation:
The Waterfall method of the SDLC is known for causing a notable delay between requirements analysis and system deployment.
Every stage of the software development lifecycle is finished in order, without repetition or overlap, using the waterfall method. This could cause a delay in progress because requirements analysis must be finished and approved before going on to the next stage.
The Waterfall method adheres to a rigid sequential process, which may result in longer deployment times than other methods like Prototype, Rapid Application Development (RAD), and Agile development, which encourage iterative and flexible approaches. Furthermore, making bad design choices early in the process can result in problems that are challenging to fix in the Waterfall model, which could cause more delays and necessitate a large time commitment to fine-tune the detailed design. Although a system that satisfies the original requirements may be produced by this strict approach, the lack of flexibility may make it difficult to implement changes without causing significant delays.