Final answer:
To calculate the total cost to produce one fitting, combine the costs of steel, alloy, direct labor and overhead which totals $2040.
Step-by-step explanation:
The total cost to produce one fitting at West Partners involves the addition of costs for steel, alloy, direct labor, and overhead. First, steel costs are calculated as 100 pounds at $10 per pound, resulting in $1000. Next, the alloy, capable of withstanding extreme temperatures, costs 50 pounds at $20 per pound, totaling $1000. Direct labor is required for 0.5 hours at $40 per hour, adding up to $20. Finally, the overhead cost per unit is $20. Adding up these figures provides the total cost:
- Steel: 100 pounds × $10/pound = $1000
- Alloy: 50 pounds × $20/pound = $1000
- Direct Labor: 0.5 hours × $40/hour = $20
- Overhead: $20 per unit
Total Cost= Steel + Alloy + Direct Labor + Overhead
= $1000 + $1000 + $20 + $20
= $2040
Therefore, the total cost to produce one fitting is $2040.