Answer:
1800 J
Step-by-step explanation:
We are given that
Weightlifter hold weight, w=1500N
Height of weightlifter from ground,h=1m
Length of chain=2m
Total weight of chain, w'=400 N
We have to find the work done required to lift the barbell to height of 2m.
Total work done=Work done to lift a barbell and half of the chain+ work done to lift the upper half of the chain
Total work done=
![1500+(1)/(2)(400)+(1)/(2)(400)((1)/(2)(1))](https://img.qammunity.org/2022/formulas/physics/college/3apr6vs5lnrp8zr14o64gu89j2ilq1vrmb.png)
Total work done=
![1700+100](https://img.qammunity.org/2022/formulas/physics/college/o9hzci5u85aan2fkgzmuehtj8glugr8g3c.png)
Total work done=1800 J
Hence, work done is required to lift the barbell to a height of 2 m=1800 J