The process used to assign overhead costs to products is called overhead ______.

User Cloudcop
by
8.5k points

2 Answers

3 votes

Step-by-step explanation:

the overhead allocation rate

3 votes

Answer:

The process used to assign overhead costs to products is called overhead allocation.

Step-by-step explanation: