Fill in the blank so that products unloaded and time are in a proportional relationship.

A conveyer belt unloads 48 products in 6 minutes. The same conveyor belt unloads
⬜ products in 1 minute.

1 Answer

2 votes

Answer: 8 products in 1 minute

Explanation:

6 min=48 products

48/6=8

1 min= 8 products