1) Gathering the data
The whole road: 7/8 miles long
Repaving speed: 1/56 mph
2) Considering that the Speed is found by:
Note that we cross multiplied that.
3) Hence, we can answer that the road crew is going to take 49 hours to repave it
1.6m questions
2.0m answers