You are going to develop some photographic film that involves a chemical reaction between the developer, which you will mix yourself, and a chemical on the surface of the film. The instructions for the developer give you four choices for how much water to dissolve the developer in to develop the film. Which option will produce the shortest film development time?
A. 0.5 L of water
B. 1.0 L of water
C. 1.5 L of water
D. 2.0 L of water