Answer:
367500Joules
Step-by-step explanation:
Work done is expressed as;
Work done = force × distance
Force = mass × acceleration due to gravity
Force = 1500×9.8
Force = 14700N
Given
Distance covered = 25m
Workdone = 14700×25
Work done = 367500Joules
Hence the work done by the tension in the elevator cable is 367500Joules