In a factory, a certain machine needs 10 min to warm up. it takes 15 min for the machine to run a cycle. the machine can operate for as long as 6 h per day including warm up time. Draw a graph showing the total time the machine operates during 1 day as a function of the number of cycles it runs.

-What domain and range are reasonable?
-Is the function a linear function?

User SRy
by
8.7k points

1 Answer

1 vote

Answer:


y =(1)/(6) + 0.25x


0 \leq x \leq23.33



0 \leq y \leq 6

Explanation:

The machine always takes 10 minutes (or 1/6 hours) to warm up and performs each cycle in 15 minutes, or 0.25 hours.


The maximum amount of daily hours that the machine can work is 6 hours.


Therefore we can represent this situation by means of an equation of the form:



y =(1)/(6) + 0.25x

Where


y = daily amount of hours the machine works.


x = number of daily cycles performed.


This equation is a linear function. Because it has the form y = ax where a is a real number

The graph of this equation is shown in the attached image, where the gray shaded area represents the domain of the function.


The domain of the function is:



x\geq 0 (because you can not perform less than zero cycles a day)



x \leq23.33. Because the machine can not exceed 6 hours per day, then it can not do more than 23.33 cycles.


So:



0 \leq x \leq23.33


The range of the function is:



y \geq 0 (because you can not work less than 0 hours a day)



y \leq 6 (because the machine can not work more than 6 hours a day)


So



0 \leq y \leq 6

In a factory, a certain machine needs 10 min to warm up. it takes 15 min for the machine-example-1
User Eric Cousineau
by
7.4k points

No related questions found

Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.

9.4m questions

12.2m answers

Categories