184k views
18 votes
Every 2/3 hour, Harris can sew 1/6 pair of jeans.

What is Harris's rate in pairs of jeans per hour?

Drag and drop the correct value into the box.

User Rick Rat
by
4.8k points

2 Answers

9 votes

Answer:

1/4

Explanation:

First we need to do jeans per hour

"per" means 1 and in this case 3/3 is 1 for us

1/6 / 2/3 or 1/6 over 2/3

To get 2/3 to 3/3 or 1 we need to multiply the reciprocal which is 3/2

If we do that we get 1/6 times 3/2 over 1

1/6 times 3/2 is 3/12 or 1/4

Now we have 1/4 / 1 or 1/4 over 1.

Therefore we can say Harris can sew 1/4 pair of jeans per hour.

User Ashelyn Dawn
by
4.6k points
12 votes

Answer:

2/3 x 6 = 12/3

12/3 = 4 hours (to make the pair of jeans)

4 hours / 4 = 1 hour (1/4 of the pants complete)

Hope this helps!

User Pravin Sonawane
by
5.3k points