116k views
9 votes
Gina, a mechanical engineer, is designing a roller coaster for a theme park. When she

tested her prototype, the roller coaster car came off the track. To continue the
engineering design process, Gina should

A. keep working on this project by herself with the same prototype.

B. make a completely new prototype with several structural changes.

C. work with others to identify why her prototype failed and test new iterations.

D.stop working on the roller coaster project and find a different problem to solve.

User Punith
by
8.4k points

1 Answer

8 votes
I would say C because it’s always best to get other’s opinion on how something can be fixed or even be worked on to be better.
User Jen
by
8.5k points