An ​x-bar control chart was examined and no data points fell outside of the limits. Can this process be considered in​ control?

a.Not​ yet, there could be a pattern to the points.
b.Not​ yet, the ​R-chart must be checked.
c.Not​ yet, the number of samples must be known.
d.Yes. Both A and B

1 Answer

0 votes

Answer:

d.Yes. Both A and B