A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet projected demand of 480 units per day. The tasks necessary to produce this product:

Task Time (sec) Immediate Predecessor

u 30 none

v 30 u

w 6 u

x 12 w

y 54 x

z 30 v, y


If the company desires that output rate equal demand, what is the desired cycle time (in seconds)?

(A) 162

(B) 72

(C) 54

(D) 12

(E) 60

User Commander
by
6.2k points

1 Answer

5 votes

Answer:

desired cycle time: 60 seconds

Step-by-step explanation:

The desired cycle time should match production with demand

If there is a demand per day of 480 units then the cycle time should be:

8 hours x 60 minute x 60 seconds = 28,800 second

we divide this by the 480 units of demand:

28,800 second/ 480 units = 60‬

The company needs to complete a unit in a 60 second time period.