220k views
2 votes
Consider two different machines with two different instruction sets, both of which have a clock rate of 350 MHz. The following measurements are recorded on the two machines running a given set of benchmark programs. Instruction Type Instruction Count (millions) Cycles per Instruction Machine A Arithmetic and logic Load and store Branch Others 8 4 2 4 2 3 4 3 Machine B Arithmetic and logic Load and store Branch Others 10 8 2 4 1 2 4 3

1 Answer

4 votes

Answer:

This question has two parts

In first part we have to determine CPI, MPS rates and execution time of both machines.

In second step we have to give comments on the derived results

Step-by-step explanation:

Both steps are explained and solved in the images attached.

Consider two different machines with two different instruction sets, both of which-example-1
Consider two different machines with two different instruction sets, both of which-example-2
Consider two different machines with two different instruction sets, both of which-example-3
Consider two different machines with two different instruction sets, both of which-example-4
User Ged
by
5.7k points