A contractor brought 12.6 ft.² of sheet metal. She had used 3.7 ft.² so far and has $267 Worth of sheet metal remaining. The equation 12.6 X -3.7 X equals 267 represent how much sheet metal germinating in the cost of the remaining amount. How much does sheet metal cost per square foot?