Given these observed times (in minutes) for five elements of a job, determine the observed time (OT) for each element. Note: Some of the elements occur only periodically. (Round your answers to 2 decimal places.) CYCLE Element 1 2 3 4 5 6 1 1.2 1.2 1.2 1.2 1.2 - 2 - .7 - .7 - 0.7 3 2.2 2.2 2.2 3.2 2.2 2.2 4 3.2 - - 4.2 - - 5 0.7 .7 1.2 0.7 0.7 0.7