Tweaking the Initial Assembly-Line Design From past experience, Toshihiro has found that the initial assembly-line design supplied by the engineers often needs to be tweaked. Consider the following questions that Toshihiro is considering: What is the daily capacity of the assembly line designed by the engineers

User Samii
by
5.1k points

1 Answer

1 vote

Answer:

259 units per day.

Step-by-step explanation:

The line operates for 7.5 hours per day. Workstation 4 is the bottleneck in the initial line balance, limiting the cycle time to 1.73 minutes, so output is limited to 34.61 units/hours × 7.5 hours = 259 units per day.