Answer:
It would take 12 men 4.5 (four and a half) days to do the same amount of work as the 9 men in 6 days.
Explanation:
9 is 75% of 12 (12*.75=9) if they work at the same rate it would take 75% of the time it did for the 9 men (6hrs*.75=4.5)