Answer:
Explanation:
Let Carl do the job in c days, Anne- in a, and Bob in b days
Then the portion of job they can do is 1/c, 1/a and 1/b
As per given we have below equations:
- 1/c + 1/b= 1/6
- 1/a + 1/b = 1/3
- 1/a + 1/c = 1/5
Sum of all 3 equations gives us:
- 2(1/a + 1/b + 1/c) = 1/6 + 1/3 + 1/5
- 2(1/a + 1/b + 1/c) = 5/30 + 10/30 + 6/30
- 2(1/a + 1/b + 1/c) = 21/30
- 2(1/a + 1/b + 1/c) = 7/10
- 1/a + 1/b + 1/c = 7/20
It means all three together can complete 7/20 of the job in one day
The rest of the job is done by Anne and Bob:
As Anne and Bob can do 1/3 of the job in one day, they need time to complete the rest:
Add 1 day to this to find overall time:
- 1 + 39 /20 = 59/20 days or 2.95 days