Answer:
It will take 5.6 days for the 10 men to dig the same hole 7 m deep.
Explanation:
Laying the data in column
----------------------------------------------------
6 men 3 m hole 4 days
10 men 7 m hole x days
-----------------------------------------------------
As
men dig a hole in
days, so their rate will be:
Then
men would take
days to dig a hole of depth 7 m.
As we are letting 10 men do work, so they would
take
days.
so
days
Therefore, it will take 5.6 days for the 10 men to dig the same hole 7 m deep.