Answer:
Predetermined manufacturing overhead rate= $37.28 per direct labor hour
Step-by-step explanation:
Giving the following information:
Estimated overhead= 3,700,000 + 960,000= $4,660,000
Estimated direct labor hours= 125,000
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 4,660,000/125,000
Predetermined manufacturing overhead rate= $37.28 per direct labor hour