Total weight, w = 10 lbs.
Height of the bucket, h = 2 feet.
Distance walked, d = 100 ft.
Now, work done in moving the bucket at a height of 2 feet.
W = mgh
W = 2× 32.17×100
W = 6434 lbs ft²/s²
Work done in moving bucket in horizontal direction is zero because it is perpendicular to the force.
Therefore, work done is 6434 lbs ft²/s² .
Hence, this is the required solution.