127k views
2 votes
If a manufacturing process takes 4 hours per unit of x and 2 hours per unit of y and a maximum of 100 hours of manufacturing process time are available,then an algebraic formulation of this constraint is:_______.

A) 4x + 2y ï³ 100
B) 4x ï­ 2y ï£ 100
C) 4x + 2y ï£ 100
D) 4x ï­ 2y ï³ 100

User John R
by
6.1k points

1 Answer

3 votes

Answer:

The algebraic formulation of the constraint is 4X+2Y ≤ 100

Step-by-step explanation:

The algebraic formulation of the constraint is shown below:

Given that

The number of hours taken per unit of x is 4 hours

And the number of hours taken per unit of x is 2 hours

And, the maximum hours available is 100

Now based on the above information

The algebraic formulation of the constraint is

= 4X+2Y ≤ 100

hence, the same is to be considered

User Shivlal Kumavat
by
5.8k points