Answer:
K = 96 and the design speed of the curve = 50mph
Step-by-step explanation:
109+00 = 10900
Elevation = 950ft
110+77 = 11077
Elevation = 947.34ft
Station of low point = 110+50 = 11050
To get grade of curve
Gi = 947.34-950/11077-10900
= -2.66/177
= -0.015x100
= -1.5%
Locate of low point (XL)
= 11050-10900
= 150
To get the value of K
XL = |GL| x K
When we substitute values
150 = 1.5 x K
150 = 1.5K
K = 150/1.5
K = 100
The suitable and most nearest value is K = 96
Then we use the standard chart to get the design speed for K = 96
On this chart, the design speed for the curve = 50mph
Therefore K = 96 and speed = 50mph