129k views
4 votes
The principal at Riverside High School would like to estimate the mean length of time each day that it takes all the buses to arrive and unload the students. How large a sample is needed if the principal would like to assert with​ 90% confidence that the sample mean is off​ by, at​ most, 7 minutes. Assume that s=14 minutes based on previous studies.

1 Answer

2 votes

Answer:

A

Explanation:

I took test

User Lone Nebula
by
6.3k points