142k views
4 votes
A bulldozer does 15,000 J of work lifting dirt 15 m up to get it out of a hole. How much force did the bulldozer use to accomplish this task?

User Cherba
by
5.2k points

1 Answer

3 votes

Answer:

The answer is 3000 N

Step-by-step explanation:

The amount of force can be found by using the formula


f = (w)/(d) \\

w is the workdone

d is the distance

From the question we have


f = (15000)/(5) \\

We have the final answer as

3000 N

Hope this helps you

User Gens
by
5.1k points